Concrete has been poured into the cinder block walls. The ‘cutouts’ in the cinder block walls (see pictures below) are the doors to the viewing rooms.
As soon as the concrete cures and is tested, the glulam and steel beams will be moved into position to install. The general contractor, Renco General Contractors out of Roseburg, are on site and ready to proceed.
Here’s a shout out to Butch Shields for having his crew sand and powder coat the steel beams. And thanks again to all of you who have contributed money, material, time and energy into our project.